New systems for the US GOM in the design phase.

Helifuel are strongly represented in the US Gulf.

Whilst the BP MD2 projects left the Helifuel yard last week, another 3 new fuelling systems are in the design stage also to be installed on platforms in the US Gulf.

The contracts are signed with major oil companies and all three are specified with high complexity and shall meet the USCG design criteria.

All three systems are planned to be delivered in 2020.